top of page

BRIDGES WITH MATHS

​

 

This workshop aims to demonstrate the use of Maths in an engineering problem. After an initial discussion about the various types of bridges and the people involved in designing bridges, pupils are set the task of testing the material to be used for making their bridge; in this case straws. The test is carried out by measuring and recording the weight that a given number of straws can support over a span of 10 cm. These results are plotted on a graph. The graph is then used to plan how many straws will be needed to build a bridge with a greater span which can support a given weight. Their design is then built and tested.

yearGroupIcon.png

Upper Key Stage 2

numbersIcon.png

Maximum group size per session 32

timeIcon.png

2 - 2.5 hours

costIcon.png

£110 plus materials at £15 per maximum of 32 pupils

Soanes Centre activities are designed and delivered by Setpoint London East.  We are a registered charity (number 1073086) and a company limited by guarantee (number 3441632).

​

We rely on sponsorship, grants and donations to keep our activities affordable for schools.  Find out how you can support us.

​

Privacy Policy  |  Cookie Policy  |  Safeguarding Policy

 

Individual risk assessments for workshops can be found in the workshop information pages.

We are grateful to our supporters:

East End Community Foundation logo
Tower Hill Trust logo
Foyle Foundation logo
bottom of page